Chapter 2 General Operation
2-22
2.6 Result Screens
2.6.1 Result
overview
The Result overview screen is displayed automatically when a test is
started by pressing the Start key or when test results are loaded as
described in 2.7.4 “Load Results”.
The Result overview screen can also be accessed manually by pressing
the Result soft key (F3) on the general soft key panel displayed on the
Status and Test Automator screens.
If no test is running or no test has been started since the Ethernet
application was selected at the Top Menu, the Result overview screen is
blank.
Figure 2.6.1-1 Result overview Screen with Test Schedule
The test schedule displayed on the Result overview screen is similar to
the test schedule setup on the Test Automator screen. An LED at the left
of each test shows the test status as follows:
A grey (blinking) LED indicates the running test.
A green LED indicates that the test has been completed successfully
without errors.
A red LED indicates that the test has completed, but an error
occurred during the test.
A black LED indicates that the test has not yet been executed.
To access a more detailed result screen for the individual tests in the test
schedule, navigate to the required test using the Up and Down arrow
keys and press the Set key.
Summary of Contents for Mainframe MU909060A Series
Page 24: ...IV...
Page 54: ...Chapter 1 Outline 1 30...
Page 61: ...2 2 General Functions 2 7 2 General Operation Power Down Starts power down...
Page 164: ...Chapter 5 Pass through 5 8...
Page 182: ...Appendix A Specifications A 8...
Page 190: ...Index Index 6...