
Chapter 1 Overview
1-16
To prepare the AC Charger/Adapter:
1. Pull the Release and remove the Guard if it is in place (Figure
1.5.1-1).
2. Select the required plug from the AC Charger/Adapter kit. See the
following figure.
3. Hold the Release down and insert the plug adapter, making sure
that the tab on the plug adapter is seated in the slot on the top of the
AC Charger/Adapter transformer.
4. Release the Release, making sure that the tab on the Release is
seated in the slot on the base of the plug adapter.
AC Power Operation
Operate the Network Master on AC power as described below.
Summary of Contents for Mainframe MU909060A Series
Page 24: ...IV...
Page 54: ...Chapter 1 Outline 1 30...
Page 61: ...2 2 General Functions 2 7 2 General Operation Power Down Starts power down...
Page 164: ...Chapter 5 Pass through 5 8...
Page 182: ...Appendix A Specifications A 8...
Page 190: ...Index Index 6...