
Chapter 2 General Operation
2-8
2.2.5 Setup
Use the following procedure to access the Setup screen
1. With the Network Master powered up, press the Menu/Power key at
the Top Menu. The General Functions pop-up menu is displayed
with Setup highlighted.
2. Press
the
Set key. The Setup screen is displayed.
Figure 2.2.5-1 Setup screen
3. Use
the
Up and Down arrow keys to highlight Date & Time.
(a) Press
the
Set key. The Date and Time dialog box is displayed.
Use the Left and Right arrow keys to highlight the required
selection.
(b) Use
the
Up and Down arrow keys to scroll to the desired
setting.
(c) Repeat steps 3(a) and 3(b) until the required date and time are
displayed in the dialog box.
(d) Press
OK (F1) to accept the new date and time setting.
4. Highlight
Color Theme and use the Left and Right arrow keys to
scroll to the required color theme.
5. Highlight
Language and use the Left and Right arrow keys to scroll
to the required language.
6. Highlight
Auto Backlight and use the Left and Right arrow keys to
scroll to the required time interval to turn off the backlight
automatically when no keys have been pressed. Press any key to
restore the backlight. This function is active only when the
instrument is battery powered.
7. Highlight
Auto Power Off and then use the Left and Right arrow
keys to scroll to the desired time interval to automatically power
down the Network Master when no keys have been pressed. This
function is active only when the instrument is battery powered.
8. Highlight
Apply and press the Set key to apply the displayed
general settings.
Summary of Contents for Mainframe MU909060A Series
Page 24: ...IV...
Page 54: ...Chapter 1 Outline 1 30...
Page 61: ...2 2 General Functions 2 7 2 General Operation Power Down Starts power down...
Page 164: ...Chapter 5 Pass through 5 8...
Page 182: ...Appendix A Specifications A 8...
Page 190: ...Index Index 6...