Chapter 3 Application Ethernet
Use the Up, Down, Left and Right arrow keys to move the red frame to
the following options:
Test setup: pressing Set while this is selected displays the
test-specific setup screens. This setup is described in the sections
about specific tests.
Remove test: pressing Set while this is selected, removes the test
from the Test schedule box.
Move test: pressing Set while this is selected moves the test as
shown:
Figure 3.2.4-4 Test Schedule with Test Movement Enabled
As shown in Figure 3.2.4-4, when the arrow is in bold, use the Up and
Down arrow keys to move the selected test up or down in the list.
Figure 3.2.4-5 Test Schedule with Test Moved
Pressing Set disables movement so the Up, Down, Left and Right arrow
keys can be used to select between the three test options again.
Figure 3.2.4-6 Test Schedule with Movement Disabled after Test
Moved
3-22
Summary of Contents for Mainframe MU909060A Series
Page 24: ...IV...
Page 54: ...Chapter 1 Outline 1 30...
Page 61: ...2 2 General Functions 2 7 2 General Operation Power Down Starts power down...
Page 164: ...Chapter 5 Pass through 5 8...
Page 182: ...Appendix A Specifications A 8...
Page 190: ...Index Index 6...