
Chapter 5 Pass through
5-6
5.4 Result
The Result screen is blank when no test has been run, but starts
displaying results as soon as the test is started. After starting the test,
the Network Master automatically switches to the Result overview
screen if it is not already displayed.
5.4.1 Pass Through
When the Result screen is opened, the default tab is Pass Through
(Figure 5.4.1-1). This tab displays an overview of current traffic
conditions and is refreshed every one second until the test is stopped.
Figure 5.4.1-1 Result Screen
[1] This is the overview of incoming traffic. Use the Statistics tab for
more detailed information.
1
Summary of Contents for Mainframe MU909060A Series
Page 24: ...IV...
Page 54: ...Chapter 1 Outline 1 30...
Page 61: ...2 2 General Functions 2 7 2 General Operation Power Down Starts power down...
Page 164: ...Chapter 5 Pass through 5 8...
Page 182: ...Appendix A Specifications A 8...
Page 190: ...Index Index 6...