
Note
Action
Attach the roundslings to the robot according to the figure.
4
Make sure the roundslings do not rub against any sharp edges.
Fit roundslings A and C with slack. They prevent the robot from rotating if there is a
sudden stop during transport.
4x
B
A
C
D
xx2200001829
Quantity
Note
Description
Pos
1 pcs
2 -3 m depending on robot vari-
ant.
i
Roundsling
A
4 pcs
2.5 m
Roundsling
B
1 pcs
2 - 2.5 m depending on robot vari-
ant.
ii
Roundsling
C
4 pcs
Lifting eye M20
D
i
Fit the roundsling with slack. They prevent the robot from rotating if there is a sudden stop
during transport.
ii
Fit the roundsling with slack. They prevent the robot from rotating if there is a sudden stop
during transport.
WARNING
Personnel must not, under any circumstances,
be present under the suspended load.
5
Raise the overhead crane to lift the robot.
6
Product manual - IRB 6740
71
3HAC085701-001 Revision: A
© Copyright 2023 ABB. All rights reserved.
3 Installation and commissioning
3.3.3.3 Lifting the robot with roundslings
Continued
Summary of Contents for OmniCore IRB 6740
Page 1: ...ROBOTICS Product manual IRB 6740 ...
Page 8: ...This page is intentionally left blank ...
Page 14: ...This page is intentionally left blank ...
Page 36: ...This page is intentionally left blank ...
Page 176: ...This page is intentionally left blank ...
Page 608: ...This page is intentionally left blank ...
Page 638: ...This page is intentionally left blank ...
Page 658: ...This page is intentionally left blank ...
Page 663: ......