
Note
Action
xx1300000736
Run the cabling through the base.
•
Make sure that the cables are not
twisted. Each cable must be in line
with its position on the base plate.
•
Make sure that the R1.SMB cable
will run on the correct side of the
R1.MP1, see the figure.
2
Make sure that the markings on the cables
are facing the base cover, when connected.
3
Screw dimension for R1.MP: M6x25 A2-70
Connect connectors R1.MP and R1.SMB.
4
Tightening torque for R1.MP: 10 Nm.
Tightening torque for R1.SMB: 10 Nm.
xx2100001109
Screw dimension: M6x16.
Connect the earth cable.
5
Washer dimension: 6.4x17x3.
Tightening torque: 10 Nm.
xx2200001790
Continues on next page
490
Product manual - IRB 6740
3HAC085701-001 Revision: A
© Copyright 2023 ABB. All rights reserved.
5 Repair
5.9.1 Replacing the axis-1 gearbox
Continued
Summary of Contents for OmniCore IRB 6740
Page 1: ...ROBOTICS Product manual IRB 6740 ...
Page 8: ...This page is intentionally left blank ...
Page 14: ...This page is intentionally left blank ...
Page 36: ...This page is intentionally left blank ...
Page 176: ...This page is intentionally left blank ...
Page 608: ...This page is intentionally left blank ...
Page 638: ...This page is intentionally left blank ...
Page 658: ...This page is intentionally left blank ...
Page 663: ......