
Note
Action
Torx pan head screw: M6x16 A4-80
Refit the cable bracket on the frame.
3
Tightening torque: 10 Nm.
xx2200001388
Positioning the robot for refitting of the balancing device front shaft
Note
Action
Turn the power to the robot on temporarily.
1
Use caution and jog the robot to the calibration
position.
2
DANGER
Turn off all:
•
electric power supply
•
hydraulic pressure supply
•
air pressure supply
to the robot, before entering the safeguarded
space.
3
Refitting the front shaft of the balancing device
Note
Action
Lifting shackle: SA-10-8-NA1
Apply the lifting accessory to the balancing device
(if not already done).
1
Lifting accessory (chain):
3HAC15556-1
Remove all residue of Loctite in the screw hole of
the shaft.
2
Wipe all contact surfaces inside the recess clean
from contamination.
3
Continues on next page
542
Product manual - IRB 6740
3HAC085701-001 Revision: A
© Copyright 2023 ABB. All rights reserved.
5 Repair
5.9.2 Replacing the axis-2 gearbox
Continued
Summary of Contents for OmniCore IRB 6740
Page 1: ...ROBOTICS Product manual IRB 6740 ...
Page 8: ...This page is intentionally left blank ...
Page 14: ...This page is intentionally left blank ...
Page 36: ...This page is intentionally left blank ...
Page 176: ...This page is intentionally left blank ...
Page 608: ...This page is intentionally left blank ...
Page 638: ...This page is intentionally left blank ...
Page 658: ...This page is intentionally left blank ...
Page 663: ......