
Note
Action
Shown in the figure
the assembly of the tilthouse unit on
page 177
Fit the inner
VK cover
(C) on both axes.
16
Shown in the figure
the assembly of the tilthouse unit on
page 177
Fit the outer
VK cover
(D) on both axes.
17
Specified in
Fill bearings with grease.
18
Detailed in section
cable harness, upper end (incl. axis
6) on page 158
Refit the motor cable, axis 6.
19
xx0600002735
Refit the M6 screw and washer at the cover for
filling grease.
20
•
A: Screw M6, grease filling hole
Detailed in section
linkage - upper rod on page 201
Refit the upper rod.
21
Pendulum Calibration is described in
Operating manual - Calibration Pendu-
lum
, enclosed with the calibration
tools.
Recalibrate the robot.
22
Axis Calibration is described in
rating with Axis Calibration method on
page 315
General calibration information is in-
cluded in section
DANGER
Make sure all safety requirements are met when
performing the first test run.
23
190
Product manual - IRB 660
3HAC025755-001 Revision: W
© Copyright 2006-2020 ABB. All rights reserved.
4 Repair
4.4.2 Replacement of tilthouse unit
Continued
Summary of Contents for IRB 660
Page 1: ...ROBOTICS Product manual IRB 660 ...
Page 8: ...This page is intentionally left blank ...
Page 332: ...This page is intentionally left blank ...
Page 352: ...This page is intentionally left blank ...
Page 354: ...This page is intentionally left blank ...
Page 360: ......
Page 361: ......