
Note
Action
Secure the
SMB cover
with its attachment
screws.
8
If cabling is used for 7th axis (option), refit the
connector R2.FB7 to the SMB cover and tighten
with 6 Nm.
WARNING
Before continuing any service work, please
observe the safety information in section
brake release buttons may be jammed after
service work on page 149
.
9
Push the cable harness up through the lower
arm.
10
Shown in
lower end (axes 1-3) on page 150
.
Refit the
metal clamps
holding the cable har-
ness in the frame and lower arm with its attach-
ment screws.
11
xx1100000157
Refit the
cable guide, axis 2
.
12
See section
ness, upper end (incl. axis 6) on
page 158
Continue refitting the cable harness in the upper
arm.
13
See section
Update the revolution counter!
14
DANGER
Make sure all safety requirements are met when
performing the first test run.
15
Product manual - IRB 660
157
3HAC025755-001 Revision: W
© Copyright 2006-2020 ABB. All rights reserved.
4 Repair
4.3.1 Replacing cable harness, lower end (axes 1-3)
Continued
Summary of Contents for IRB 660
Page 1: ...ROBOTICS Product manual IRB 660 ...
Page 8: ...This page is intentionally left blank ...
Page 332: ...This page is intentionally left blank ...
Page 352: ...This page is intentionally left blank ...
Page 354: ...This page is intentionally left blank ...
Page 360: ......
Page 361: ......