
Note
Action
xx1000001330
Pull out the cables and connectors of the SMB
unit through the frame and refit the
cable gland
with its
attachment screws
from inside the SMB
recess.
Perform this refitting with care, in order not to
damage any of the components inside the SMB
recess.
2
Tightening torque for R1.SMB: 10 Nm.
Reconnect connectors
R1.MP
and
R1.SMB
at
the robot base.
3
Attachment points are shown in the
figure
lower end (axes 1-3) on page 150
.
xx1000001314
Reconnect the
earth cable
.
4
Shown in
lower end (axes 1-3) on page 150
.
Refit the
rear cover plate
to the robot base with
its attachment screws.
5
See sections:
•
Replacing motor, axis 1 on
page 251
•
Replacing motors, axes 2 and
3 on page 258
Reconnect all connectors at
motors axes 1, 2
and
3
and refit the motor covers.
6
Reconnect connectors R2.SMB, R1.SMB1-3,
R1.SMB6 of the SMB unit.
7
Reconnect X8, X9 and X10 to the brake release
unit.
Reconnect R1.G.
Continues on next page
156
Product manual - IRB 660
3HAC025755-001 Revision: W
© Copyright 2006-2020 ABB. All rights reserved.
4 Repair
4.3.1 Replacing cable harness, lower end (axes 1-3)
Continued
Summary of Contents for IRB 660
Page 1: ...ROBOTICS Product manual IRB 660 ...
Page 8: ...This page is intentionally left blank ...
Page 332: ...This page is intentionally left blank ...
Page 352: ...This page is intentionally left blank ...
Page 354: ...This page is intentionally left blank ...
Page 360: ......
Page 361: ......