Refitting the cable harness in the base
Note
Action
xx2100001216
Run the cables through the protection tube.
1
xx1300000736
•
Make sure that the cables are not
twisted. Each cable must be in line
with its position on the base plate.
•
Make sure that the R1.SMB cable
will run on the correct side of the
R1.MP1, see the figure.
2
Make sure that the markings on the cables
are facing the base cover, when connected.
3
Screw dimension for R1.MP: M6x25 A2-70
Connect connectors R1.MP and R1.SMB.
4
Tightening torque for R1.MP: 10 Nm.
Tightening torque for R1.SMB: 10 Nm.
xx2100001109
Continues on next page
Product manual - IRB 5720
459
3HAC079195-001 Revision: A
© Copyright 2022 ABB. All rights reserved.
5 Repair
5.9.1 Replacing the axis-1 gearbox
Continued
Summary of Contents for IRB 5720
Page 1: ...ROBOTICS Product manual IRB 5720 ...
Page 8: ...This page is intentionally left blank ...
Page 14: ...This page is intentionally left blank ...
Page 36: ...This page is intentionally left blank ...
Page 186: ...This page is intentionally left blank ...
Page 580: ...This page is intentionally left blank ...
Page 604: ...This page is intentionally left blank ...
Page 609: ......