exceeded. If all conditions allow for start, the lead
compressor will start unloaded. Coincident with
the start, the programmable anti-recycle timer will
be set and begin counting downward to “0”. The
liquid line solenoid of the lead compressor will
open.
5.
After 4 seconds of run time, the motor current
of the lead compressor must be > 14% FLA and
<115% FLA. Oil pressure must be > 5 PSID 34.5
kPa). If these conditions are not met, the lead
compressor will shut down.
6.
After 30 seconds of run time, the oil pressure
of the lead compressor must be > 20 PSID (137.9
kPa) and the suction pressure must be > 50% of
cut-out. If these conditions are not met, the lead
compressor will shut down.
7.
After 2 minutes and 30 seconds of run time,
the lead compressor will load the 1st step, if cool-
ing demand (temperature and rate control) re-
quires.
8.
After 4 minutes of operation, the oil pressure
of the lead compressor must be > 25 PSID (172.4
kPa) and the suction pressure must be > cut-out.
If these conditions are not met, the lead com-
pressor will shut down.
9.
After five minutes of run time, the lead com-
pressor will load the second step, if cooling de-
mand (temperature and rate control) requires.
10.
After 7 minutes and 30 seconds of run time,
the lead compressor will load its 3rd step, if tem-
perature demand (temperature and rate control)
requires.
11.
After 10 minutes of run time, if cooling demand
requires (temperature and rate control), the lag
compressor will start unloaded and its anti-recycle
counter will begin counting back to “0”. The liquid
line solenoid will open. The lead compressor will
unload two steps to its 1st step of 3 loading steps.
12.
After 10 minutes and 4 seconds of run time,
the motor current of the lag compressor must be
> 14% FLA and < 115% FLA. Oil pressure must
be > 5 PSID (34.5 kPa). If these conditions are
not met, the lag compressor will shut down.
13.
After 10 minutes and 30 seconds of run time,
the oil pressure of the lag compressor must be >
20 PSID (137.9 kPa) and the suction pressure
must be > 50% cutout. If these conditions are not
met, the lag compressor will shut down.
14.
After 12 minutes and 30 seconds of run time,
the lag compressor will load to the 1st step of
loading, if cooling demand requires (temperature
and rate control). The lead compressor remains
unchanged at the 1st step of loading.
15.
After 14 minutes of operation, the oil pressure
of the lag compressor must be > 25 PSID (172.4
kPa) and the suction pressure must be > cutout .
If these conditions are not met, the lag compres-
sor will shut down.
16.
After 15 minutes of run time, the lead com-
pressor will load to its 2nd step of loading, if cool-
ing demand requires (temperature and rate con-
trol). The lag compressor remains unchanged at
the 1st step of loading.
17.
After 17 minutes and 30 seconds of run time,
the lag compressor will load to its 2nd step of
loading, if cooling demand requires (temperature
and rate control). The lead compressor remain
unchanged at the 2nd step on loading.
18.
After 20 minutes of run time, the lead com-
pressor will load to its 3rd and final step of load-
ing, if cooling demand requires (temperature and
rate control). The lag compressor remains un-
changed at the 2nd step of loading.
19.
After 22 minutes and 30 seconds of run time,
the lag compressor will load to its 3rd and final
step, if cooling demand requires (temperature and
rate control). The lead compressor remains un-
changed at the 3rd step of loading.
Содержание Millennium YCAJ150
Страница 21: ...FORM 150 65 NM4 21 YORK INTERNATIONAL LD02461 FIG 6 ELEMENTARY DIAGRAM Cont d...
Страница 22: ...22 YORK INTERNATIONAL ELEMENTARY DIAGRAM...
Страница 24: ...24 YORK INTERNATIONAL CONNECTION DIAGRAM FIG 7 CONNECTION DIAGRAM LD02463...
Страница 25: ...FORM 150 65 NM4 25 YORK INTERNATIONAL FIG 7 CONNECTION DIAGRAM Cont d LD02462...
Страница 26: ...26 YORK INTERNATIONAL CONNECTION DIAGRAM TERMINAL BOX AND SYSTEM WIRING FIG 8 SYSTEM WIRING LD02464...
Страница 28: ...28 YORK INTERNATIONAL CONNECTION DIAGRAM TERMINAL BOX AND SYSTEM WIRING FIG 8 SYSTEM WIRING Cont d LD02650...
Страница 30: ...30 YORK INTERNATIONAL FIG 8 SYSTEM WIRING Cont d LD02499...
Страница 100: ...100 YORK INTERNATIONAL LD02654 FIG 37B LOUVER BRACKETS INSTALLATION...
Страница 101: ...FORM 150 65 NM4 101 YORK INTERNATIONAL LD02655 FIG 37C GRILLE AND LOUVER INSTALLATION FRONT AND BACK...
Страница 103: ...FORM 150 65 NM4 103 YORK INTERNATIONAL LD02656 FIG 39A LOUVER INSTALLATION SIDES...
Страница 104: ...104 YORK INTERNATIONAL LD02654 FIG 39B LOUVER BRACKETS INSTALLATION...
Страница 105: ...FORM 150 65 NM4 105 YORK INTERNATIONAL LD02657 FIG 39C GRILLE AND LOUVER INSTALLATION FRONT AND BACK...
Страница 107: ...FORM 150 65 NM4 107 YORK INTERNATIONAL FIG 40A CONDENSER COIL LOUVER INSTALLATION SIDES LD02658...
Страница 108: ...108 YORK INTERNATIONAL FIG 40B CONDENSER COIL LOUVER INSTALLATION FRONT AND BACK LD02659...
Страница 110: ...110 YORK INTERNATIONAL FIG 41 REMOTE RESET BOARD LD02666 P1...