WARNING:
To protect warranty, this equipment must be in-
stalled and serviced by an authorized YORK ser-
vice mechanic or a qualified service person experi-
enced in chiller installation. Installation must com-
ply with all applicable codes, particularly in regard
to electrical wiring and other safety elements such
as relief valves, HP cutout settings, design work-
ing pressures and ventilation requirements consis-
tent with the amount and type of refrigerant charge.
Lethal voltages exist within the control panel. Be-
fore servicing, open and tag all disconnect switches.
FIG. 4 – RIGGING THE CHILLER
00001TG(R)
INSTALLATION CHECKLIST
The following items, 1 thru 5, must be checked before
placing units into operation.
1. Inspect unit for shipping damage.
2. Rig unit per Fig. 4. Remove unpainted shipping braces
after installation.
3. Open unit only to install water piping system. Do not
remove protective covers from water connections until
piping is ready for attachment. Check water piping to
insure cleanliness.
4. Pipe unit using good piping practice and consistent
with local code requirements.
5. Check to see that unit is installed and operated within
LIMITATIONS shown on pages 6 and 7.
The following pages outline procedures to be followed.
HANDLING
These units are shipped as completely assembled units
containing full operating charge, and care should be taken
to avoid damage due to rough handling.
The units are shipped without export crating unless it is
specified by Sales Order.
A unit should be lifted by inserting hooks through the
holes provided in unit base rails. Spreader bars should
be used to avoid crushing the unit with the lifting chains.
(See Fig. 4).
Содержание Millennium YCAJ150
Страница 21: ...FORM 150 65 NM4 21 YORK INTERNATIONAL LD02461 FIG 6 ELEMENTARY DIAGRAM Cont d...
Страница 22: ...22 YORK INTERNATIONAL ELEMENTARY DIAGRAM...
Страница 24: ...24 YORK INTERNATIONAL CONNECTION DIAGRAM FIG 7 CONNECTION DIAGRAM LD02463...
Страница 25: ...FORM 150 65 NM4 25 YORK INTERNATIONAL FIG 7 CONNECTION DIAGRAM Cont d LD02462...
Страница 26: ...26 YORK INTERNATIONAL CONNECTION DIAGRAM TERMINAL BOX AND SYSTEM WIRING FIG 8 SYSTEM WIRING LD02464...
Страница 28: ...28 YORK INTERNATIONAL CONNECTION DIAGRAM TERMINAL BOX AND SYSTEM WIRING FIG 8 SYSTEM WIRING Cont d LD02650...
Страница 30: ...30 YORK INTERNATIONAL FIG 8 SYSTEM WIRING Cont d LD02499...
Страница 100: ...100 YORK INTERNATIONAL LD02654 FIG 37B LOUVER BRACKETS INSTALLATION...
Страница 101: ...FORM 150 65 NM4 101 YORK INTERNATIONAL LD02655 FIG 37C GRILLE AND LOUVER INSTALLATION FRONT AND BACK...
Страница 103: ...FORM 150 65 NM4 103 YORK INTERNATIONAL LD02656 FIG 39A LOUVER INSTALLATION SIDES...
Страница 104: ...104 YORK INTERNATIONAL LD02654 FIG 39B LOUVER BRACKETS INSTALLATION...
Страница 105: ...FORM 150 65 NM4 105 YORK INTERNATIONAL LD02657 FIG 39C GRILLE AND LOUVER INSTALLATION FRONT AND BACK...
Страница 107: ...FORM 150 65 NM4 107 YORK INTERNATIONAL FIG 40A CONDENSER COIL LOUVER INSTALLATION SIDES LD02658...
Страница 108: ...108 YORK INTERNATIONAL FIG 40B CONDENSER COIL LOUVER INSTALLATION FRONT AND BACK LD02659...
Страница 110: ...110 YORK INTERNATIONAL FIG 41 REMOTE RESET BOARD LD02666 P1...