6 - 13
–
+
ELEC
LIGHTING SYSTEM
LIGHT SWITCH INSPECTION
1. Inspect:
●
Light switch continuity
No continuous while being
→
Replace.
Continuous while being OFF
→
Replace.
Tester (+) lead
→
Yellow lead
1
Tester (–) lead
→
Blue lead
2
Y
1
L
2
Tester selec-
tor position
Ω
×
1
OFF
CDI MAGNETO INSPECTION
1. Inspect:
●
Lighting coil resistance
Out of specification
→
Replace.
VOLTAGE REGULATOR INSPECTION
1. Start the engine.
2. Turn on the headlight and taillight by turn-
ing on the light switch.
3. Inspect:
●
Out-put voltage
Out of specification
→
Replace voltage
regulator.
Tester (+) lead
→
Yellow lead
1
Tester (–) lead
→
Black lead
2
Lighting coil
resistance
Tester selector
position
0.16 ~ 0.24
Ω
at
20 ˚C (68 ˚F)
Ω
×
1
Tester (+) lead
→
Blue lead
1
Tester (–) lead
→
Black lead
2
Out-put voltage
Tester selector
position
13.3 ~ 14.3 V at
5,000 r/min
ACV-20
B
L
1
2
1
2
Содержание WR250F(P)
Страница 326: ...4 29 ENG 7 Install Oil tank breather hose Cylinder head breather hose Spark plug T R 13 Nm 1 3 m kg 9 4 ft lb CAMSHAFTS...
Страница 604: ...5 67 CHAS REAR SHOCK ABSORBER 8 Install Band 1 Taillight connector 2...
Страница 692: ......
Страница 693: ......
Страница 694: ...PRINTED IN JAPAN 2001 9 2 7 1 CR E F G H PRINTED ON RECYCLED PAPER YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN...