B
Control contact ripple control
receiver "power-OFF"
C
Contactor
D
The air and creepage gap must
exceed 8 mm, since the control
input is a low voltage input
E
Power-OFF contact for control
unit
F
Terminals in the control panel
G
Compressor
(230 V) power sup-
ply connection
Version 2 (400/230 V)
If the power supply utility does not require a "hard" shutdown of the
compres-
sor
and/or the
instantaneous heating water heater
, it is sufficient to connect
the power-OFF contact to the junction box (
D
mandatory requirement). The
operating component is blocked by the control unit, i.e. the control-internal relay
is not actuated.
A
No power-OFF in this position
B
Control contact ripple control
receiver "power-OFF"
C
Terminals in the control panel
D
The air and creepage gap must
exceed 8 mm, since the control
input is a low voltage input
Phase monitors (only with 400 V units, accessory)
The phase monitor available as an
accessory can be used to monitor the
compressor power supply.
For this, the phase monitor is plugged
into the control module below the heat
pump control panel (see page 59).
Two versions may be used (see illus-
trations on pages 86 and 87).
The following power supply deviations
are permitted in the delivered condi-
tion:
Making the electrical connections to external . . .
(cont.)
84
Installation sequence
55
92
968
GB
Содержание VITOCAL 200-G
Страница 8: ...Certificates Declaration of conformity 201 Keyword index 202 Index cont 8 Index 5592 968 GB ...
Страница 65: ...Installing the heat pump module and making the cont 65 Installation sequence 5592 968 GB Installation ...
Страница 122: ...Main menu Information Menu structure overview information 122 Control settings 5592 968 GB ...
Страница 187: ...Parts lists cont 187 Parts lists 5592 968 GB Service ...
Страница 188: ...Parts lists cont 188 Parts lists 5592 968 GB ...
Страница 189: ...Parts lists cont 189 Parts lists 5592 968 GB Service ...
Страница 206: ...206 5592 968 GB ...
Страница 207: ...207 5592 968 GB ...