4.
Danger
The absence of component
earthing can transfer dan-
gerous body currents,
should an electrical fault
occur.
It is important to connect the
earth strap from the cross-
bar to the full wave soft star-
ter.
Attach the full wave soft starter to
upper crossbar
G
with 2 screws.
Retaining bracket
C
must be lying
against the edge of the left side
panel.
Note
Pay attention to distance between
capacitor
D
with cables attached
H
and crossbar
G
and the edge
of the crossbar as shown in illustra-
tion.
5.
Plug connector from compressor
(6-pin plug with designation PE, N,
L, S, 230, 231) to mating plug
F
on the right side of the full wave
soft starter.
Note
The plug must click home.
6.
Plug cable
E
of the full wave soft
starter to pos.
K
of control module
(see page 22).
Note
The plug must click home.
Connecting the brine pressure switch or a jumper
The brine pressure switch is con-
nected across terminals X60.11 and
X60.12 at the top of the control panel
(see also page 79).
If
no
brine pressure switch is con-
nected,
always
connect the jumper in
the pack across these terminals.
Installing a 230 V full wave soft starter (all . . .
(cont.)
70
Installation sequence
55
92
968
GB
Содержание VITOCAL 200-G
Страница 8: ...Certificates Declaration of conformity 201 Keyword index 202 Index cont 8 Index 5592 968 GB ...
Страница 65: ...Installing the heat pump module and making the cont 65 Installation sequence 5592 968 GB Installation ...
Страница 122: ...Main menu Information Menu structure overview information 122 Control settings 5592 968 GB ...
Страница 187: ...Parts lists cont 187 Parts lists 5592 968 GB Service ...
Страница 188: ...Parts lists cont 188 Parts lists 5592 968 GB ...
Страница 189: ...Parts lists cont 189 Parts lists 5592 968 GB Service ...
Страница 206: ...206 5592 968 GB ...
Страница 207: ...207 5592 968 GB ...