Note
Observe the specifications of EN 1264-4. The report to be provided by the heat-
ing contractor must contain the following heat-up details:
&
Heat-up data with respective flow temperatures
&
Actual maximum flow temperature
&
Operating condition and outside temperature during handover
The function continues after a power failure or after the control unit has been
switched OFF. The selected heating program continues, if the screed function
has terminated in accordance with the program or, before its expiry, the tem-
perature/time profile "
0
" is selected.
The temperature/time profiles 5 to 15 regulate to the maximum flow tempera-
ture.
Only one time program can be enabled, even if two heating circuits are con-
nected.
Four different temperature/time profiles are available for screed drying.
Note
If "
Building drying time
" has been activated (see page 145), no intervention
must occur here.
The settings under "
time for drying buildings
" are directly related to this set-
ting. The settings of both functions influence each other.
Temperature/time profile 1 (in acc.
with EN 1264-4)
A
Flow temperature
B
Days
Temperature/time profile 2 (to ZV
parquet and flooring technology)
A
Flow temperature
B
Days
Screed function
162
Heating circuit control settings
55
92
968
GB
Содержание VITOCAL 200-G
Страница 8: ...Certificates Declaration of conformity 201 Keyword index 202 Index cont 8 Index 5592 968 GB ...
Страница 65: ...Installing the heat pump module and making the cont 65 Installation sequence 5592 968 GB Installation ...
Страница 122: ...Main menu Information Menu structure overview information 122 Control settings 5592 968 GB ...
Страница 187: ...Parts lists cont 187 Parts lists 5592 968 GB Service ...
Страница 188: ...Parts lists cont 188 Parts lists 5592 968 GB ...
Страница 189: ...Parts lists cont 189 Parts lists 5592 968 GB Service ...
Страница 206: ...206 5592 968 GB ...
Страница 207: ...207 5592 968 GB ...