2.
If the pre-charge pressure of the
diaphragm expansion vessel is
lower than the static system pres-
sure, top up with sufficient nitrogen
to raise the pre-charge pressure
higher than the static system pres-
sure.
Example:
Static head
(distance between the
heat source and the
highest heating surface)
10 m
= static pressure
1 bar
3.
Top up with water, until the filling
pressure exceeds the pre-charge
pressure of the diaphragm expan-
sion vessel.
On a cold system, the filling pres-
sure must be approx. 0.2 bar higher
than the static pressure.
Max. operating pressure: 3.5 bar.
4.
During commissioning, mark this
value on the pressure gauge as
minimum filling pressure.
System configuration
Enable the system design used (see from page 16) and any optional compo-
nents and functions at the control unit.
Only required outside German-speaking countries: Setting the display lan-
guage
1.
Open cover of programming unit
(see page 113 and operating
instructions).
2. If the adjacent display appears:
Continue with point 4.
Further details regarding the individual steps
(cont.)
103
Commissioning, inspection, maintenance
55
92
968
GB
Service
Содержание VITOCAL 200-G
Страница 8: ...Certificates Declaration of conformity 201 Keyword index 202 Index cont 8 Index 5592 968 GB ...
Страница 65: ...Installing the heat pump module and making the cont 65 Installation sequence 5592 968 GB Installation ...
Страница 122: ...Main menu Information Menu structure overview information 122 Control settings 5592 968 GB ...
Страница 187: ...Parts lists cont 187 Parts lists 5592 968 GB Service ...
Страница 188: ...Parts lists cont 188 Parts lists 5592 968 GB ...
Страница 189: ...Parts lists cont 189 Parts lists 5592 968 GB Service ...
Страница 206: ...206 5592 968 GB ...
Страница 207: ...207 5592 968 GB ...