A
Heating command
B
Primary pump
C
Secondary pump
D
Compressor
E
Start delay
F
Secondary pump flow
G
Primary pump flow
H
OFF
K
ON
Access
&
"
Device settings
"
&
"
Programming
"
&
"
Heat pump
"
&
"Primary pump flow"
or
"
Flow sec. pump
" (
P
/
Q
)
Standard setting
2:00 min
Setting range
00:10 to 16:40
min
Optimum runtime
Setting the optimum heat pump runtime. Excessive runtimes (subject to the pri-
mary circuit layout) can lead to the geothermal probe icing up, which reduces
the efficiency (COP).
Flow; primary/secondary pump
(cont.)
140
Heat pump control settings
55
92
968
GB
Содержание VITOCAL 200-G
Страница 8: ...Certificates Declaration of conformity 201 Keyword index 202 Index cont 8 Index 5592 968 GB ...
Страница 65: ...Installing the heat pump module and making the cont 65 Installation sequence 5592 968 GB Installation ...
Страница 122: ...Main menu Information Menu structure overview information 122 Control settings 5592 968 GB ...
Страница 187: ...Parts lists cont 187 Parts lists 5592 968 GB Service ...
Страница 188: ...Parts lists cont 188 Parts lists 5592 968 GB ...
Страница 189: ...Parts lists cont 189 Parts lists 5592 968 GB Service ...
Страница 206: ...206 5592 968 GB ...
Страница 207: ...207 5592 968 GB ...