A
Control panel
B
Main PCB cover
2.
Undo screws from front panel.
Pull the front panel forward at its
upper edge and lift out upwards.
3.
Lift both top panels forward and up
and release their respective earth
strap.
4.
Undo the screws at the upper
crossbar.
5.
Remove the control unit retainer
and hook it into the r.h. front edge
of the equipment, i.e. into the ser-
vice position.
Preparing the installation
(cont.)
56
Installation sequence
55
92
968
GB
Содержание VITOCAL 200-G
Страница 8: ...Certificates Declaration of conformity 201 Keyword index 202 Index cont 8 Index 5592 968 GB ...
Страница 65: ...Installing the heat pump module and making the cont 65 Installation sequence 5592 968 GB Installation ...
Страница 122: ...Main menu Information Menu structure overview information 122 Control settings 5592 968 GB ...
Страница 187: ...Parts lists cont 187 Parts lists 5592 968 GB Service ...
Страница 188: ...Parts lists cont 188 Parts lists 5592 968 GB ...
Страница 189: ...Parts lists cont 189 Parts lists 5592 968 GB Service ...
Страница 206: ...206 5592 968 GB ...
Страница 207: ...207 5592 968 GB ...