3.
!
Please note
With 400 V units, the wrong
phase sequence can
damage the equipment.
The power supply connec-
tion must have a
clockwise
rotating field in the phase
sequence that is specified at
the terminals.
Note
For possible power supply connec-
tion versions, see page 88
onwards.
400 V connection:
Make power supply connection to
the terminals marked PE, L1, L2
and L3 at pos.
B
of the control
module (see page 19).
230 V connection:
Make power supply connection to
the terminals marked L1, N and PE
at pos.
B
of the control module
(see page 22).
Checking the rotating field of the power supply connection (400
V units only)
!
Please note
With 400 V units, the wrong phase sequence can damage the equipment.
The power supply connection must have a
clockwise
rotating field in the
phase sequence that is specified at the terminals.
With phase monitor installation
1.
Fit phase monitor (accessory) to
pos.
F
(see page 19) on top-hat
rail of control module.
2.
Fit plug of phase monitor to pos.
G
of the control module (see
page 19).
Inserting the electrical cables and power supply . . .
(cont.)
59
Installation sequence
55
92
968
GB
Installation
Содержание VITOCAL 200-G
Страница 8: ...Certificates Declaration of conformity 201 Keyword index 202 Index cont 8 Index 5592 968 GB ...
Страница 65: ...Installing the heat pump module and making the cont 65 Installation sequence 5592 968 GB Installation ...
Страница 122: ...Main menu Information Menu structure overview information 122 Control settings 5592 968 GB ...
Страница 187: ...Parts lists cont 187 Parts lists 5592 968 GB Service ...
Страница 188: ...Parts lists cont 188 Parts lists 5592 968 GB ...
Страница 189: ...Parts lists cont 189 Parts lists 5592 968 GB Service ...
Страница 206: ...206 5592 968 GB ...
Страница 207: ...207 5592 968 GB ...