Page 39
4.6.
Program 6: Extra Drying Time
For all loads when the load requires additional drying after the cycle
is completed.
Nominal parameters default settings
Drying time: 5 minutes (may be changed by the operator (see sec.
5.1.1)).
Operations Sequence
Drying for 5 minutes.