Operating Instructions | HERAcell® 150i / 240i
10
Maintenance
10
Maintenance
10
Maintenance
114
50115191 A / 08.2009
4. For devices equipped with the optional gas-tight
screen, the measurement opening is located:
– on HERAcell
®
150 i [1] in the center gas-tight
screen,
– on HERAcell
®
240 i [2] in the left center gas-
tight screen.
5. Remove the measuring probe, plug the
measurement opening and close the doors.
6. Calibrate the CO
2
control.
IR measuring cell:
For devices with infrared (IR) measuring
cells, the CO
2
calibration can only be
performed when the CO
2
concentration has
been set to 4.0% or more.
Calibration should be performed with the
CO
2
set value designated for the work
process (prospective work process value).
Fig. 72:
Gas-tight screen measurement opening
Содержание Heracell 150i
Страница 156: ......