Operating Instructions | HERAcell® 150i / 240i
49
50115191 A / 08.2009
5
Start-up
5.1 Preparing the work space
7. Upon delivery, the CO
2
incubator is not in a sterile
state. Before the initial start-up, the device must
be decontaminated.
Before the decontamination is performed, the
following work space components must be cleaned:
• Support rails,
• support hooks,
• shelves,
• bottle turning assembly (optional),
• gas humidification (optional),
• work space surfaces,
• work space seals and gaskets,
• glass door/gas-tight screen.
Decontamination:
For details about the cleaning and
disinfection of the device,
(see chap. 9‚
pg. 100)
.
5.2 Installing the shelf system
Tools are not required for the installation of the shelf
system. The support rails are secured using spring
pressure. After the support hooks have been inserted
into the rail, the shelves are pushed onto the support
hooks.
5.2.1 Installation/removal of the support rail
The support rails are held at the sides by the
embossings [2] and [5] and secured by the
embossings [1] and [6]. The support rails marked with
the diamond shape are inserted at the rear panel of the
device with the locksprings [3] facing upward.
1. Position the support rail [4] onto the lower
embossing [6] and tilt it toward the work space
side wall so that the rail is positioned over the two
embossings [5] and [2].
2. Clamp the lockspring [3] behind the upper
embossing [1].
3. To remove the support rails, pull the lockspring
tab down out of the embossing and remove the
rail.
Fig. 18: Support rail installation/removal
Содержание Heracell 150i
Страница 156: ......