Operating Instructions | HERAcell® 150i / 240i
3
Installation of the device
3
Installation of the device
3
Installation of the device
24
50115191 A / 08.2009
3.4 Transport
Fig. 2:
For transport, do not lift the device using the
doors or components attached to the device (e.g.
control box on rear panel) as lift points.
Lift points:
Lift the device only using the lift points.
3.5 Stacking
Fig. 3:
HERAcell
®
150i / 240i is suited for stacking up
to two devices of the same device type. For thermal
separation, an adapter plate [3] can be placed between
the two devices.
HERAcell
®
150i
• Place the adapter plate with the receptacles [4] at
the bottom onto the stacking elements [5] on top
of the device. Make sure that the adapter plate is
seated safely on the stacking elements.
• Place the device to be stacked with the device
stands [1] onto the stacking elements [2] at the top
of the adapter plate.
HERAcell
®
240i
• Place the adapter plate with the receptacle
recesses [8] at the bottom onto the stacking
elements [9] on top of the device. Make sure that
the adapter plate is seated safely on the recesses.
• Place the device to be stacked with the device
stands [6] onto the stacking elements [7] at the top
of the adapter plate.
The devices are secured to one another by their own
weight.
Transporting stacked devices!
The stacking elements are not locking
elements. Therefore, it is not permitted to
transport stacked devices.
Fig. 2: Lift points
Fig. 3: Stacking
Содержание Heracell 150i
Страница 156: ......