FUEL SYSTEM AND THROTTLE BODY 5-25
Step 3
• Repeat the procedures of step 2 when air screws were
cleaned.
• Close the SDS tool and turn the ignition switch OFF.
• Disconnect the vacuum tester and reinstall the removed parts.
• After completing the throttle valve synchronization, clear the
DTC and reset the ISC aperture learned value using SDS
tool. (
4-25 and 5-21)
Содержание GW250
Страница 1: ...SERVICE MANUAL GW250 9 9 5 0 0 3 2 1 7 0 0 1 E...
Страница 42: ...2 26 PERIODIC MAINTENANCE...
Страница 98: ...3 50 ENGINE TRANSMISSION PARTS LOCATION 1 Countershaft 2 Driveshaft...
Страница 261: ...EXHAUST SYSTEM 6 1 EXHAUST SYSTEM CONTENTS 6 EXHAUST SYSTEM 6 2 REMOVAL 6 2 INSPECTION 6 3 INSTALLATION 6 3...
Страница 478: ...Printed in Japan L3 CHANGZHOU HAOJUE SUZUKI MOTORCYCLE CO LTD...