9-10 ELECTRICAL SYSTEM
REGULATED VOLTAGE
• Remove the seat. (
8-5)
• Start the engine and keep it running at 5 000 r/min with the
dimmer switch turned HI position.
• Measure the DC voltage between the
+
and
-
battery termi-
nals using the multi circuit tester. If the voltage is not within
the specified value, inspect the generator and regulator/recti-
fier. (
9-10 to -11)
NOTE:
When making this test, be sure that the battery is in fully charged
condition.
09900-25008: Multi circuit tester set
Tester knob indication: Voltage (
)
Regulated voltage (Charging output):
14.0 – 15.5 V at 5 000 r/min
GENERATOR COIL RESISTANCE
• Remove the right frame cover. (
8-4)
• Disconnect the generator coupler
1
.
• Measure the resistance between the three lead wires.
If the resistance is out of specified value, replace the stator
with a new one. Also, check that the generator core is insu-
lated properly.
09900-25008: Multi circuit tester set
Tester knob indication: Resistance (
)
Generator coil resistance: 0.2 – 0.9
(Y – Y)
(Y – Ground)
Battery
DCV
Y
Y
Y
Содержание GW250
Страница 1: ...SERVICE MANUAL GW250 9 9 5 0 0 3 2 1 7 0 0 1 E...
Страница 42: ...2 26 PERIODIC MAINTENANCE...
Страница 98: ...3 50 ENGINE TRANSMISSION PARTS LOCATION 1 Countershaft 2 Driveshaft...
Страница 261: ...EXHAUST SYSTEM 6 1 EXHAUST SYSTEM CONTENTS 6 EXHAUST SYSTEM 6 2 REMOVAL 6 2 INSPECTION 6 3 INSTALLATION 6 3...
Страница 478: ...Printed in Japan L3 CHANGZHOU HAOJUE SUZUKI MOTORCYCLE CO LTD...