COOLING AND LUBRICATION SYSTEM 7-19
• Apply grease to the new O-ring
C
.
99000-25010: SUZUKI SUPER GREASE “A”
or equivalent
• Install the water pump with the slot on the pump shaft end
E
securely engaged with the flat
F
of the oil pump shaft.
• Tighten the water pump mounting bolts
D
to the specified
torque.
Water pump mounting bolt: 10 N·m (1.0 kgf-m, 7.0 lbf-ft)
• Install the dowel pins
E
and speed sensor bracket
F
.
• Tighten the speed sensor bracket bolts to the specified
torque.
Speed sensor bracket bolt: 10 N·m (1.0 kgf-m, 7.0 lbf-ft)
• Install the engine sprocket cover
G
.
• Tighten the engine sprocket cover bolts to the specified
torque.
Engine sprocket cover bolt: 10 N·m (1.0 kgf-m, 7.0 lbf-ft)
• Connect the water pump inlet and outlet hoses. (
10-21)
• Pour engine coolant. (
2-15)
• Pour engine oil. (
2-11)
• Bleed air from the cooling circuit. (
2-16)
Содержание GW250
Страница 1: ...SERVICE MANUAL GW250 9 9 5 0 0 3 2 1 7 0 0 1 E...
Страница 42: ...2 26 PERIODIC MAINTENANCE...
Страница 98: ...3 50 ENGINE TRANSMISSION PARTS LOCATION 1 Countershaft 2 Driveshaft...
Страница 261: ...EXHAUST SYSTEM 6 1 EXHAUST SYSTEM CONTENTS 6 EXHAUST SYSTEM 6 2 REMOVAL 6 2 INSPECTION 6 3 INSTALLATION 6 3...
Страница 478: ...Printed in Japan L3 CHANGZHOU HAOJUE SUZUKI MOTORCYCLE CO LTD...