
3-90 ENGINE
• Turn the crankshaft counterclockwise and tighten the cam-
shaft sprocket bolts
5
to the specified torque.
Camshaft sprocket bolt: 15 N·m (1.5 kgf-m, 11.0 lbf-ft)
• Turn the crankshaft counterclockwise to bring the “I R” line on
generator rotor to the index mark
E
of the valve inspection
hole and also to bring the camshaft to the position as shown.
(
3-89)
• Install the dowel pins.
• Apply engine oil to camshaft journal holders.
• Install the camshaft journal holders, (L)
6
and (R)
7
.
• Fasten the camshaft journal holder (R)
7
evenly by tightening
the camshaft journal holder bolts lightly, in the ascending
order of numbers.
NOTE:
* Each camshaft journal holder is identified with a embossed let-
ters Land R.
(
3-91)
* The ascending order of numbers are indicated on the cam-
shaft journal holders.
(
3-91)
• Turn the crankshaft counterclockwise 540 degrees (1-1/2
turns) and align the “I L” line on the generator rotor to the
index mark
F
of valve timing inspection hole.
• Fasten the camshaft journal holder (L)
6
evenly by tightening
the camshaft journal holder bolts lightly, in the ascending
order of numbers.
R
Damage to head or camshaft journal holder thrust sur-
faces may result if the camshaft journal holders are
not drawn down evenly.
L
Содержание GW250
Страница 1: ...SERVICE MANUAL GW250 9 9 5 0 0 3 2 1 7 0 0 1 E...
Страница 42: ...2 26 PERIODIC MAINTENANCE...
Страница 98: ...3 50 ENGINE TRANSMISSION PARTS LOCATION 1 Countershaft 2 Driveshaft...
Страница 261: ...EXHAUST SYSTEM 6 1 EXHAUST SYSTEM CONTENTS 6 EXHAUST SYSTEM 6 2 REMOVAL 6 2 INSPECTION 6 3 INSTALLATION 6 3...
Страница 478: ...Printed in Japan L3 CHANGZHOU HAOJUE SUZUKI MOTORCYCLE CO LTD...