
CHASSIS 8-11
REASSEMBLY AND INSTALLATION
Reassemble and install the front wheel in the reverse order of removal and disassembly.
Pay attention to the following points:
WHEEL BEARING
• Apply grease to the new wheel bearings.
99000-25010: SUZUKI SUPER GREASE “A”
or equivalent
A
LH
B
RH
a
Clearance
2 – 5 mm
(0.08 – 0.20 in)
2 – 5 mm
(0.08 – 0.20 in)
65 N.m
(6.5 kgf-m, 47.0 lbf-ft)
18 N.m
(1.8 kgf-m, 13.0 lbf-ft)
26 N.m
(2.6 kgf-m, 19.0 lbf-ft)
23 N.m
(2.3 kgf-m, 16.5 lbf-ft)
Содержание GW250
Страница 1: ...SERVICE MANUAL GW250 9 9 5 0 0 3 2 1 7 0 0 1 E...
Страница 42: ...2 26 PERIODIC MAINTENANCE...
Страница 98: ...3 50 ENGINE TRANSMISSION PARTS LOCATION 1 Countershaft 2 Driveshaft...
Страница 261: ...EXHAUST SYSTEM 6 1 EXHAUST SYSTEM CONTENTS 6 EXHAUST SYSTEM 6 2 REMOVAL 6 2 INSPECTION 6 3 INSTALLATION 6 3...
Страница 478: ...Printed in Japan L3 CHANGZHOU HAOJUE SUZUKI MOTORCYCLE CO LTD...