FUEL SYSTEM AND THROTTLE BODY 5-1
5
FUEL SYSTEM AND THROTTLE BODY
CONTENTS
FUEL SYSTEM............................................................................................. 5- 2
FUEL TANK REMOVAL ........................................................................ 5- 2
FUEL TANK INSTALLATION ............................................................... 5- 3
FUEL PRESSURE INSPECTION .......................................................... 5- 3
FUEL PUMP INSPECTION ................................................................... 5- 4
FUEL DISCHARGE AMOUNT INSPECTION ....................................... 5- 4
FUEL PUMP RELAY INSPECTION ...................................................... 5- 5
FUEL PUMP AND FUEL LEVEL GAUGE REMOVAL ......................... 5- 6
FUEL PUMP DISASSEMBLY ............................................................... 5- 8
FUEL MESH FILTER INSPECTION AND CLEANING ......................... 5- 9
FUEL PUMP AND FUEL LEVEL GAUGE
REASSEMBLY AND INSTALLATION .................................................. 5- 9
THROTTLE BODY ....................................................................................... 5-11
CONSTRUCTION .................................................................................. 5-11
THROTTLE BODY REMOVAL.............................................................. 5-12
THROTTLE BODY DISASSEMBLY...................................................... 5-13
THROTTLE BODY CLEANING ............................................................. 5-15
INSPECTION ......................................................................................... 5-15
THROTTLE BODY REASSEMBLY....................................................... 5-16
THROTTLE BODY INSTALLATION ..................................................... 5-17
FUEL INJECTOR REMOVAL................................................................ 5-18
FUEL INJECTOR INSPECTION............................................................ 5-18
FUEL INJECTOR INSTALLATION ....................................................... 5-18
ISC VALVE REMOVAL ......................................................................... 5-18
ISC VALVE INSPECTION ..................................................................... 5-20
ISC VALVE INSTALLATION................................................................. 5-20
ISC VALVE RESET ............................................................................... 5-21
TP RESET.............................................................................................. 5-22
THROTTLE VALVE SYNCHRONIZATION ........................................... 5-23
* Keep away from fire or spark.
* During disassembling, use care to minimize spillage of gasoline.
* Spilled gasoline should be wiped off immediately.
* Work in a well-ventilated area.
* To prevent the fuel system (fuel tank, fuel hose, etc.) from contamination
with foreign particles, blind all openings.
* After removing the throttle body, tape the cylinder intake section to pre-
vent foreign particles from entering.
Содержание GW250
Страница 1: ...SERVICE MANUAL GW250 9 9 5 0 0 3 2 1 7 0 0 1 E...
Страница 42: ...2 26 PERIODIC MAINTENANCE...
Страница 98: ...3 50 ENGINE TRANSMISSION PARTS LOCATION 1 Countershaft 2 Driveshaft...
Страница 261: ...EXHAUST SYSTEM 6 1 EXHAUST SYSTEM CONTENTS 6 EXHAUST SYSTEM 6 2 REMOVAL 6 2 INSPECTION 6 3 INSTALLATION 6 3...
Страница 478: ...Printed in Japan L3 CHANGZHOU HAOJUE SUZUKI MOTORCYCLE CO LTD...