3-10 ENGINE
• Install the clutch release camshaft retainer
9
. (
10-16)
• Apply a small quantity of thread lock to the oil clutch release
camshaft retainer bolt
0
.
99000-32110: THREAD LOCK CEMENT SUPER “1322”
or equivalent
• When installing the clutch release arm
A
, align the groove
E
of clutch release arm
A
with the slit
F
of clutch release cam-
shaft.
• Tighten the engine sprocket cover bolts
B
to the specified
torque.
Engine sprocket cover bolt: 10 N·m (1.0 kgf-m, 7.0 lbf-ft)
• Tighten the oil pressure switch lead wire bolt
C
to the speci-
fied torque.
Oil pressure switch lead wire bolt:
1.5 N·m (0.15 kgf-m, 1.0 lbf-ft)
• Tighten the starter motor mounting bolts
D
and starter motor
lead wire bolt
E
to the specified torque. (
10-16)
Starter motor mounting bolt:
10 N·m (1.0 kgf-m, 0.7 lbf-ft)
Starter motor lead wire bolt:
2.7 N·m (0.27 kgf-m, 2.0 lbf-ft)
Содержание GW250
Страница 1: ...SERVICE MANUAL GW250 9 9 5 0 0 3 2 1 7 0 0 1 E...
Страница 42: ...2 26 PERIODIC MAINTENANCE...
Страница 98: ...3 50 ENGINE TRANSMISSION PARTS LOCATION 1 Countershaft 2 Driveshaft...
Страница 261: ...EXHAUST SYSTEM 6 1 EXHAUST SYSTEM CONTENTS 6 EXHAUST SYSTEM 6 2 REMOVAL 6 2 INSPECTION 6 3 INSTALLATION 6 3...
Страница 478: ...Printed in Japan L3 CHANGZHOU HAOJUE SUZUKI MOTORCYCLE CO LTD...