ENGINE 3-93
• Install new gasket
1
to the cylinder head cover.
• Apply bond to the cam end caps of the gaskets as shown.
99000-31140: SUZUKI BOND No.1207B or equivalent
• Place the cylinder head cover on the cylinder head.
• Apply engine oil to both sides of the new gaskets
2
.
• Fit a new gasket
2
to each head cover bolt.
• Tighten the cylinder head cover bolts to the specified torque.
Cylinder
head cover bolt:
Initial: 10 N·m (1.0 kgf-m, 7.0 lbf-ft)
Final : 14 N·m (1.4 kgf-m, 10.0 lbf-ft)
• Tighten the cylinder head cover cap bolts to the specified
torque.
Cylinder head cover cap bolt: 10 N·m (1.0 kgf-m, 7.0 lbf-ft)
• Install the spark plug. (
2-7)
Содержание GW250
Страница 1: ...SERVICE MANUAL GW250 9 9 5 0 0 3 2 1 7 0 0 1 E...
Страница 42: ...2 26 PERIODIC MAINTENANCE...
Страница 98: ...3 50 ENGINE TRANSMISSION PARTS LOCATION 1 Countershaft 2 Driveshaft...
Страница 261: ...EXHAUST SYSTEM 6 1 EXHAUST SYSTEM CONTENTS 6 EXHAUST SYSTEM 6 2 REMOVAL 6 2 INSPECTION 6 3 INSTALLATION 6 3...
Страница 478: ...Printed in Japan L3 CHANGZHOU HAOJUE SUZUKI MOTORCYCLE CO LTD...