EMISSION CONTROL INFORMATION 11-3
PAIR (AIR SUPPLY) SYSTEM AND EMISSION CONTROL SYSTEM
INSPECTION
PAIR HOSES
• Remove the fuel tank. (
5-2)
• Inspect the PAIR hoses
1
for wear or damage. If it is worn or
damaged, replace the PAIR hoses
1
with a new one.
PAIR REED VALVE
• Remove the left fuel tank cover. (
8-5)
• Remove the PAIR reed valve cover
1
and PAIR read valve
2
.
• Inspect the reed valve for the carbon deposit. If the carbon
deposit is found in the PAIR reed valve, replace the PAIR
reed valve with a new one.
• Install the PAIR reed valve and PAIR reed valve cover.
(
11-6)
• Apply thread lock to the bolts
1
and tighten to the specified
torque.
99000-32110: THREAD LOCK CEMENT SUPER “1322”
or equivalent
PAIR reed valve cover bolt: 10 N·m (1.0 kgf-m, 7.0 lbf-ft)
Содержание GW250
Страница 1: ...SERVICE MANUAL GW250 9 9 5 0 0 3 2 1 7 0 0 1 E...
Страница 42: ...2 26 PERIODIC MAINTENANCE...
Страница 98: ...3 50 ENGINE TRANSMISSION PARTS LOCATION 1 Countershaft 2 Driveshaft...
Страница 261: ...EXHAUST SYSTEM 6 1 EXHAUST SYSTEM CONTENTS 6 EXHAUST SYSTEM 6 2 REMOVAL 6 2 INSPECTION 6 3 INSTALLATION 6 3...
Страница 478: ...Printed in Japan L3 CHANGZHOU HAOJUE SUZUKI MOTORCYCLE CO LTD...