2-10 PERIODIC MAINTENANCE
• Turn the crankshaft counterclockwise 540 degrees (1-1/2
turns) to set the #1 (Left) cylinder at TDC of compression
stroke. Bring the notch
C
on the left end of camshaft to the
position as shown.
D
Intake side
• Inspect the #1 (Left) cylinder valve clearance as the same
manner of #2 (Right) cylinder and adjust the clearance if nec-
essary.
Valve clearance adjuster lock-nut:
10 N·m (1.0 kgf-m, 7.0 Ibf-ft)
09900-20803: Thickness gauge
09917-14910: Tappet adjust driver
• After finishing the valve clearance adjustment, reinstall the fol-
lowing items.
* Cylinder head cover and cylinder head caps (
3-93)
* Spark plugs and plug caps (
2-7)
* Reservoir tank (
7-7)
* Exterior parts
Содержание GW250
Страница 1: ...SERVICE MANUAL GW250 9 9 5 0 0 3 2 1 7 0 0 1 E...
Страница 42: ...2 26 PERIODIC MAINTENANCE...
Страница 98: ...3 50 ENGINE TRANSMISSION PARTS LOCATION 1 Countershaft 2 Driveshaft...
Страница 261: ...EXHAUST SYSTEM 6 1 EXHAUST SYSTEM CONTENTS 6 EXHAUST SYSTEM 6 2 REMOVAL 6 2 INSPECTION 6 3 INSTALLATION 6 3...
Страница 478: ...Printed in Japan L3 CHANGZHOU HAOJUE SUZUKI MOTORCYCLE CO LTD...