COOLING AND LUBRICATION SYSTEM 7-7
• Apply thread lock to the reservoir tank mounting bolts
3
and
tighten them to the specified torque as shown in the cooling
system hose routing. (
10-20)
Reservoir tank mounting bolt:
6 N·m (0.6 kgf-m, 4.5 lbf-ft)
99000-32110: THREAD LOCK CEMENT SUPER “1322”
or equivalent
• Route the reservoir tank hoses properly. (
10-20)
• Pour engine coolant. (
2-15)
• Bleed air from the cooling circuit. (
2-16)
WATER HOSE INSPECTION
• Remove the left and right fuel tank covers. (
8-5)
• Check the water hoses for crack, damage or engine coolant
leakage. If any defect is found, replace the water hose with a
new one.
• Any leakage from the connecting section should be corrected
by proper tightening.
RADIATOR CAP INSPECTION
• Attach the cap
1
to the radiator cap tester
2
.
• Slowly apply pressure to the radiator cap
1
. If the radiator
cap does not hold the pressure for at least 10 seconds,
replace it with a new one.
Radiator cap valve opening pressure:
Standard:
93 – 123 kPa
(0.93 – 1.23 kgf/cm², 13.2 – 17.5 psi)
Содержание GW250
Страница 1: ...SERVICE MANUAL GW250 9 9 5 0 0 3 2 1 7 0 0 1 E...
Страница 42: ...2 26 PERIODIC MAINTENANCE...
Страница 98: ...3 50 ENGINE TRANSMISSION PARTS LOCATION 1 Countershaft 2 Driveshaft...
Страница 261: ...EXHAUST SYSTEM 6 1 EXHAUST SYSTEM CONTENTS 6 EXHAUST SYSTEM 6 2 REMOVAL 6 2 INSPECTION 6 3 INSTALLATION 6 3...
Страница 478: ...Printed in Japan L3 CHANGZHOU HAOJUE SUZUKI MOTORCYCLE CO LTD...