
7-18 COOLING AND LUBRICATION SYSTEM
• Install the rubber seal
3
into the impeller
4
.
• After wiping off the oily or greasy matter from the mechanical
seal ring
5
, install it into the impeller.
NOTE:
The paint marked side
B
of mechanical seal ring faces the rub-
ber seal.
• Install the washer
6
and seal washer
7
onto the impeller
securing bolt.
NOTE:
The metal side
C
of seal washer and the curved side
D
of
washer face the impeller securing bolt head.
• Install the impeller
8
.
• Tighten the impeller securing bolt
9
to the specified torque.
Impeller securing bolt: 8 N·m (0.8 kgf-m, 6.0 lbf-ft)
• Install a new O-ring
0
and apply engine coolant to it.
• Fit the water pump cover and tighten the water pump cover
screws
A
to the specified torque.
Water pump cover screw: 5.5 N·m (0.55 kgf-m, 4.0 lbf-ft)
• Install a new gasket washer and tighten the water pump air
bleeder bolt
B
.
Содержание GW250
Страница 1: ...SERVICE MANUAL GW250 9 9 5 0 0 3 2 1 7 0 0 1 E...
Страница 42: ...2 26 PERIODIC MAINTENANCE...
Страница 98: ...3 50 ENGINE TRANSMISSION PARTS LOCATION 1 Countershaft 2 Driveshaft...
Страница 261: ...EXHAUST SYSTEM 6 1 EXHAUST SYSTEM CONTENTS 6 EXHAUST SYSTEM 6 2 REMOVAL 6 2 INSPECTION 6 3 INSTALLATION 6 3...
Страница 478: ...Printed in Japan L3 CHANGZHOU HAOJUE SUZUKI MOTORCYCLE CO LTD...