IGNITION SYSTEM (FOR J20/H25 ENGINES) 6F2-7
On-Vehicle Service
Ignition Spark Check
1) For H25 engine, remove surge tank cover.
2) Disconnect injector coupler (1).
3) Remove spark plug and check it for condition and type, refer-
ring to “Spark Plug” in this section.
4) If OK, connect ignition coil coupler to ignition coil assembly
and connect spark plug to ignition coil assembly. Ground
spark plug.
5) Crank engine and check if each spark plug sparks.
If no spark is emitted, inspect the related parts as described
under “Diagnosis” earlier in this section.
6) After checking, install spark plug, referring to “Spark Plug” in
this section.
7) Connect injector coupler (1).
8) For H25 engine, install surge tank cover.
Ignition Timing Check and Adjustment
1) Start engine and warm it up to normal operating tempera-
ture.
2) Make sure that all of electrical loads except ignition are
switched off.
3) Check to be sure that idle speed is within specification.
Refer to “Idle Speed/Idle Air Control Duty Inspection” in Sec-
tion 6E1 or 6E2.
WARNING:
Without disconnection of injector coupler, combustible
gas may come out from spark plug holes during this test
and may get ignited in engine room.
[A] : J20 Engine
[B] : H25 Engine
NOTE:
Before starting engine, place transmission gear shift
lever in “Neutral” (shift selector lever to “P” range for A/T
model), and set parking brake.
Содержание Engine 2002 GRAND VITARA SQ625
Страница 5: ......
Страница 248: ...ENGINE GENERAL INFORMATION AND DIAGNOSIS H25 ENGINE 6 1 107 Fig for Step 4...
Страница 274: ...ENGINE GENERAL INFORMATION AND DIAGNOSIS H25 ENGINE 6 1 133 Fig and Table for Step 3...
Страница 291: ...6 1 150 ENGINE GENERAL INFORMATION AND DIAGNOSIS H25 ENGINE...
Страница 360: ...ENGINE MECHANICAL G16 ENGINE 6A1 69 Main Bearings Crankshaft and Cylinder Block COMPONENTS...
Страница 489: ...6A2 114 ENGINE MECHANICAL H25 ENGINE...
Страница 572: ...ENGINE MECHANICAL J20 ENGINE 6A4 83 Main Bearings Crankshaft and Cylinder Block COMPONENTS...
Страница 591: ...6A4 102 ENGINE MECHANICAL J20 ENGINE...
Страница 598: ...ENGINE COOLING 6B 7...
Страница 623: ...6B 32 ENGINE COOLING...
Страница 635: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES ENGINE AND EMISSION CONTROL SYSTEM DIAGRAM FOR G16 ENGINE...
Страница 637: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES ENGINE AND EMISSION CONTROL SYSTEM DIAGRAM FOR J20 ENGINE...
Страница 643: ...6E1 12 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES ELECTRONIC CONTROL SYSTEM COMPONENT LOCATION FOR G16 ENGINE...
Страница 645: ...6E1 14 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES ELECTRONIC CONTROL SYSTEM COMPONENT LOCATION FOR J20 ENGINE...
Страница 693: ...6E1 62 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Страница 697: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE ENGINE AND EMISSION CONTROL SYSTEM DIAGRAM...
Страница 743: ...6E2 50 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Страница 814: ...CHARGING SYSTEM 6H 21 Disassembly 70 A and 80 A types...
Страница 827: ...6H 34 CHARGING SYSTEM...
Страница 833: ...6K 6 EXHAUST SYSTEM...
Страница 834: ...Prepared by 1st Ed Dec 2002 Printed in Japan 824...