AGV Automatic Start and New Transfer Request Wait Variable:
Version 4.27 adds automatic starting for the AGV equipped machine configuration.
The 6DS-SP will automatically start when all of the following occur:
-
The Machine Setup menu Wafer Source choice is set to "AGV Intrfc"
-
Either the Auto Polish or Polish Parameters menu is showing
(the same menus required to start with the "start" pushbutton)
-
The AGV sender asserts a transfer request
Note that these conditions do not have to occur in any particular order.
They must only exist simultaneously. For example:
If the wafer source is set to "AGV Intrfc" and the Auto Polish menu is showing, the 6DS-
SP will start when the AGV sender asserts a transfer request.
If the wafer source is set to "AGV Intrfc" and the AGV sender is already asserting a
transfer request but neither the Auto Polish nor Polish Parameter menu is showing, the
6DS-SP won't start. However, if either the Auto Polish or Polish Parameter menu is
selected, all conditions exist and the 6DS-SP will start. While it will appear as if menu
selection alone caused the start, it was actually the existance of three conditions.
Also, version 4.27 adds Calibration variable 101 "AGV max xfer req wait (secs)" instead of
the original fixed value set at 120 seconds in 4.26 and 240 seconds in 4.26.1.
Wafer Slipout Detection Change:
Version 4.27 changes the time when wafer slipout monitoring starts in an automatic cycle.
This change supports new spindle mounted sensors as well as earlier bridge mounted sensors.
Wafer slipout detection will now start 0.5 seconds after the spindle(s) reaches the down
switch(s). This insures that spindle mounted sensors are fully lowered before being
monitored for a slipout. (Reference for technicians: The 0.5 second time is set in Flopro
timer #47.)
Previously, detection could start when the spindles left the up switches. With the spindles
not yet down, spindle mounted slipout sensors would give false alarms.
ViPRR Default Pressure Change:
Version 4.27 changes the retaining ring default pressure after polishing. After polishing,
ViPRR pressure is now set to zero instead of a nominal 2 psi. This helps insure that the
wafer is not pushed off the carrier. However, retaining ring pressure is set to 2 psi after wafer
unloading to extend the ring for proper loading of the next wafers.
Spindle Lifting Cylinder Support:
Содержание 6DS-SP
Страница 1: ......
Страница 4: ...Copyright 1998 by Strasbaugh All rights reserved Document prepared by Technical Publications Group...
Страница 19: ...Introduction INTRODUCTION...
Страница 58: ......
Страница 59: ...Introduction ACHINE ESCRIPTION...
Страница 108: ...Introduction PERATOR UNCTIONS...
Страница 131: ...Strasbaugh Operator Functions Version 4 0 February 1998 3 23 Figure 3 4 Menu Selection...
Страница 134: ...Operations Model 6DS SP Planarizer 3 26 Version 4 0 February 1998 Figure 3 5 Home Machine Menu...
Страница 145: ...Strasbaugh Operator Functions Version 4 0 February 1998 3 37 Figure 3 8 Recipe Management Menu...
Страница 150: ...Operations Model 6DS SP Planarizer 3 42 Version 4 0 February 1998 Figure 3 9 Home Machine Menu...
Страница 153: ...Strasbaugh Operator Functions Version 4 0 February 1998 3 45 Figure 3 10 Auto Polish Cycle Menu...
Страница 166: ...Operations Model 6DS SP Planarizer 3 58 Version 4 0 February 1998 Figure 3 11 Slurry Flush Menu...
Страница 202: ...Operations Model 6DS SP Planarizer 3 94 Version 4 0 February 1998 This page intentionally left blank...
Страница 203: ...Introduction ACHINE ETUP...
Страница 210: ...Strasbaugh Machine Setup Version 4 0 February 1998 4 7 Figure 4 2 Slurry Flush Menu...
Страница 213: ...Operations Model 6DS SP Planarizer 4 10 Version 4 0 February 1998 Figure 4 3 Recipe Management Menu...
Страница 216: ...Strasbaugh Machine Setup Version 4 0 February 1998 4 13 Figure 4 4 Polish Parameters Menu...
Страница 223: ...Operations Model 6DS SP Planarizer 4 20 Version 4 0 February 1998 Figure 4 5 Sweep Parameters Menu...
Страница 236: ...Strasbaugh Machine Setup Version 4 0 February 1998 4 33 Figure 4 8 Machine Parameters Menu Screen Page 1...
Страница 239: ...Operations Model 6DS SP Planarizer 4 36 Version 4 0 February 1998 Figure 4 9 Machine Parameters Menu Screen Page 2...
Страница 242: ...Strasbaugh Machine Setup Version 4 0 February 1998 4 39 Figure 4 10 Machine Parameters Menu Screen Page 3...
Страница 247: ...Operations Model 6DS SP Planarizer 4 44 Version 4 0 February 1998 Figure 4 11 Alarm Parameters Menu...
Страница 251: ...Operations Model 6DS SP Planarizer 4 48 Version 4 0 February 1998 Figure 4 12 Machine Setup Menu...
Страница 254: ...Strasbaugh Machine Setup Version 4 0 February 1998 4 51 Figure 4 13 Password Menu...
Страница 257: ...Operations Model 6DS SP Planarizer 4 54 Version 4 0 February 1998 This page intentionally left blank...
Страница 258: ...Introduction TROUBLESHOOTING...
Страница 267: ...Strasbaugh Troubleshooting Version 4 0 February 1998 5 9 Figure 13 1 Alarm Log Menu...
Страница 326: ...Introduction APPENDICES...
Страница 328: ...Operations Model 6DS SP Planarizer Version 4 0 February 1998 This page intentionally left blank...
Страница 329: ...Introduction LECTRIAL NPUT UTPUT...
Страница 331: ...Operations Model 6DS SP Planarizer This page intentionally left blank...
Страница 332: ......
Страница 335: ...Copyright 1998 by Strasbaugh All rights reserved Document prepared by Technical Publications Group...
Страница 355: ...Maintenance Model 6DS SP Planarizer xxii Version 4 0 February 1998 This page intentionally left blank...
Страница 356: ...Introduction REVISIONS...
Страница 357: ...Introduction INTRODUCTION...
Страница 395: ...Maintenance Model 6DS SP Planarizer 1 38 U Version 4 0 February 1998 Update 10 19 01 GUARANTEE WARRANTY CERTIFICATE...
Страница 396: ......
Страница 407: ...Strasbaugh Installation Version 4 0 February 1998 Update 11 06 01 2 11 U...
Страница 420: ...Maintenance Model 6DS SP Planarizer 2 24 U Version 4 0 February 1998 Update 11 06 01 This page intentionally left blank...
Страница 421: ...Introduction HYSICAL ESCRIPTION...
Страница 444: ...Introduction ECHANICAL ESCRIPTION...
Страница 462: ...Maintenance Model 6DS SP Planarizer 4 18 Version 4 0 February 1998 This page intentionally left blank...
Страница 463: ...Introduction CONTROL SYSTEM DESCRIPTION...
Страница 470: ...Introduction OWER ISTRIBUTION...
Страница 478: ...Maintenance Model 6DS SP Planarizer 6 8 Version 4 0 February 1998 This page intentionally left blank...
Страница 479: ...Introduction LUMBING ESCRIPTION...
Страница 489: ...Maintenance Model 6DS SP Planarizer 7 10 Version 4 0 February 1998 This page intentionally left blank...
Страница 490: ...Introduction REVENTATIVE AINTENANCE CHEDULES...
Страница 507: ...Introduction ECHANICAL AINTENANCE ROCEDURES...
Страница 516: ......
Страница 520: ...Maintenance Model 6DS SP Planarizer 9 12 Version 4 0 February 1998 Figure 9 7 Retainer Clamp Ring...
Страница 690: ...Maintenance Model 6DS SP Planarizer 9 182 Version 4 0 February 1998 This page intentionally left blank...
Страница 691: ...Introduction OFTWARE ALIBRATION ROCEDURES...
Страница 703: ...Maintenance Model 6DS SP Planarizer 10 12 Version 4 0 February 1998 Figure 10 2 Manual Control Menu Screen Page 1...
Страница 707: ...Maintenance Model 6DS SP Planarizer 10 16 Version 4 0 February 1998 Figure 10 3 Manual Control Menu Screen Page 2...
Страница 710: ...Strasbaugh Software Calibration Procedures Version 4 0 February 1998 10 19 Figure 10 4 Manual Control Menu Screen Page 3...
Страница 713: ...Maintenance Model 6DS SP Planarizer 10 22 Version 4 0 February 1998 Figure 10 5 Diagnostics Menu...
Страница 716: ...Strasbaugh Software Calibration Procedures Version 4 0 February 1998 10 25 Figure 10 6 Calibration Configuration Menu...
Страница 862: ...Introduction NEUMATIC DJUSTMENTS...
Страница 897: ...Introduction OFTWARE ONTROL OMPUTER AINTENANCE...
Страница 912: ...Introduction TROUBLESHOOTING...
Страница 921: ...Strasbaugh Troubleshooting Version 4 0 February 1998 13 9 Figure 13 1 Alarm Log Menu...
Страница 980: ...Maintenance Model 6DS SP Planarizer 13 68 Version 4 0 February 1998 This page intentionally left blank...
Страница 981: ......
Страница 984: ...Copyright 1998 by Strasbaugh All rights reserved Document prepared by Technical Publications Group...
Страница 1004: ...Maintenance Model 6DS SP Planarizer xxii Version 4 0 February 1998 This page intentionally left blank...
Страница 1005: ...Introduction APPENDICES...
Страница 1006: ...Introduction ALIBRATION ARIABLES IST...
Страница 1008: ...Maintenance Model 6DS SP Planarizer This page intentionally left blank...
Страница 1071: ...STRASBAUGH INC 6DS SP User Interface Reference May 31 2001 Ver 4 37 This page intentionally left blank...
Страница 1073: ...STRASBAUGH INC 6DS SP User Interface Reference May 31 2001 Ver 4 37 This page intentionally left blank...
Страница 1082: ...STRASBAUGH INC May 31 2001 Ver 4 37 6DS SP User Interface Reference Page 9 This page intentionally left blank...
Страница 1086: ...STRASBAUGH INC May 31 2001 Ver 4 37 6DS SP User Interface Reference Page 13 This page intentionally left blank...
Страница 1094: ...STRASBAUGH INC May 31 2001 Ver 4 37 6DS SP User Interface Reference Page 21...
Страница 1103: ...STRASBAUGH INC Page 30 6DS SP User Interface Reference May 31 2001 Ver 4 37...
Страница 1105: ...STRASBAUGH INC Page 32 6DS SP User Interface Reference May 31 2001 Ver 4 37 Continued on next page...
Страница 1111: ...STRASBAUGH INC Page 38 6DS SP User Interface Reference May 31 2001 Ver 4 37 This page intentionally left blank...
Страница 1115: ...STRASBAUGH INC Page 42 6DS SP User Interface Reference May 31 2001 Ver 4 37 This page intentionally left blank...
Страница 1119: ...STRASBAUGH INC Page 46 6DS SP User Interface Reference May 31 2001 Ver 4 37 This page intentionally left blank...
Страница 1123: ...STRASBAUGH INC Page 50 6DS SP User Interface Reference May 31 2001 Ver 4 37 This page intentionally left blank...
Страница 1467: ...Introduction SSEMBLY RAWINGS...
Страница 1468: ...Strasbaugh Appendices Version 4 0 February 1998 Appendix B Engineering Drawings bound under separate cover Customer Parts Lists...
Страница 1469: ...Maintenance Model 6DS SP Planarizer This page intentionally left blank...
Страница 1470: ...Introduction ARTS IST...
Страница 1471: ...Introduction LECTRICAL NPUT UTPUT...
Страница 1473: ...Maintenance Model 6DS SP Planarizer This page intentionally left blank...
Страница 1474: ...Introduction PTIONS...
Страница 1476: ...Strasbaugh Appendices Version 4 0 February 1998 Appendix D Options...
Страница 1477: ...Maintenance Model 6DS SP Planarizer This page intentionally left blank...
Страница 1478: ...Introduction AINTENANCE OG HEETS...
Страница 1479: ...Strasbaugh Appendices Version 4 0 February 1998 Appendix E Maintenance Log Sheets...
Страница 1480: ...Maintenance Model 6DS SP Planarizer This page intentionally left blank...
Страница 1481: ......
Страница 1482: ......
Страница 1483: ......
Страница 1484: ......
Страница 1485: ......
Страница 1507: ...Maintenance Model 6DS SP Planarizer xxii Version 4 0 February 1998 This page intentionally left blank...
Страница 1508: ...Introduction APPENDICES...
Страница 1509: ...Strasbaugh Appendices Version 4 0 February 1998 Appendix F Manufacturer Data Attached CD...
Страница 1510: ...Maintenance Model 6DS SP Planarizer This page intentionally left blank...
Страница 1511: ......
Страница 1533: ...Maintenance Model 6DS SP Planarizer xxii Version 4 0 February 1998 This page intentionally left blank...
Страница 1534: ...Introduction APPENDICES...
Страница 1535: ...Strasbaugh Appendices Version 4 0 February 1998 Appendix F Part 2 Manufacturers Data Sheets...
Страница 1536: ...Maintenance Model 6DS SP Planarizer This page intentionally left blank...
Страница 1537: ......
Страница 1559: ...Maintenance Model 6DS SP Planarizer xxii Version 4 0 February 1998 This page intentionally left blank...
Страница 1560: ...Introduction APPENDICES...
Страница 1561: ...Strasbaugh Appendices Version 4 0 February 1998 Appendix F Part 3 Manufacturers Data Sheets Go to Manufacturer Data...
Страница 1562: ...Maintenance Model 6DS SP Planarizer This page intentionally left blank...