8.4.19 Priorities
The following priorities apply to motor operations:
1. On/Off during wiring test.
2. Off by motor supervision ("Flow signal", "Overload signal").
3. Motor times ("Switch-on delay", "Switch-off delay", min. switch-on time, min.
switch-off time).
4. Locking speed 2 (dependent on outside temperature).
5. On by outside temperature.
6. On by "Motor kick" (no motor times available).
7. Off by "Stop condition 1" and 2.
8. On by "Start condition 1".
9. On by "Start condition 2".
See Sections 8.4.3, 8.4.4, 8.4.5, 8.4.8, and 8.4.10 for the motor times.
Note
8.5
Modulating output
A
"Modulating output" is a function to generate a modulating DC 0...10 V output
signal. 8 "Modulating outputs" are available:
Purpose
Functional scope:
Inversion
Max. selection from 3 signals
Limitations
8.5.1
Enable modulating output
You must first assign an output to enable the "Modulating output" function.
Main menu > Commissioning > Extra configuration > Aggregates > Modulating outputs >
Modulating output A...H >
Configuration
Operating line
Adjustable values / Comment
Modulating output A…
Modulating output H
---, N.Y1, N.Y2, ... / enable modulating output.
124 / 216
Siemens
Switching and monitoring device RMS705B
CE1P3124en
Building Technologies
Aggregates