151 / 216
Siemens
Switching and monitoring device RMS705B
CE1P3124en
Building Technologies
H/C demand, H/C changeover
01.04.2010
Plant
Configuration diagram
T
N.X1
N.Y1
Heat distr zone 1
N.X1
°C
N.Y1
N.Q1
A
Heat distr zone 1
Heat distr zone 2,
source side
Contrl.
Main menu > Commissioning > Extra configuration > Aggregates > Heat demand >
Operating line
Range
Setting
Primary controller
Yes, No
Yes
Main menu > Commissioning > Settings > ….
or
Main menu > Settings > Controller 1 > Setpoints >
Operating line
Range
Setting
Setpoint high
500.0 °C > x > Setpoint low
70.0 °C
Setpoint low
Setpoint high > x > -50.0 °C
70.0 °C
Main menu > Commissioning > Communication > Distribution zones >
Operating line
Range
Setting
Heat distribution zone
1…31
1
Heat distr zone source side
----, 1…31
2
Main menu > Commissioning > Settings > Aggregates > Heat demand >
Operating line
Range
Setting
Heating flow setpoint
0…140 °C
70 °C
Flow temperature reduction
max
0…100 K
30 K
Main menu > Commissioning > Settings > Controller 1 > Setpoint effects >
Operating line
Range
Setting
[Setp compensation 1] delta
-50.0…+50.0 K
30 K
[Setp compensation 1] start
-50.0…+500.0 °C
70 °C
[Setp compensation 1] end
-50.0…+500.0 °C
40 °C
Configuration
Controller settings
Communication settings
Heat demand
Universal shift