Application planning
4.4 Installation location
SIPLUS HCS4200 PROFINET/PROFIBUS DP
40
Operating Instructions, 07/2019, A5E35066204A/006
4.4.2
Double frame construction
Double frame construction
The following combinations are allowed for the installation and assembly of racks:
Combination
Side-by-side arrangement
Side-by-side arrangement
4
–
12
–
12 + 12
12 + 4
–
4 + 4
Содержание SIPLUS HCS Series
Страница 1: ...SIPLUS HCS4200 PROFINET PROFIBUS DP ...
Страница 2: ......
Страница 10: ...Table of contents SIPLUS HCS4200 PROFINET PROFIBUS DP 8 Operating Instructions 07 2019 A5E35066204A 006 ...
Страница 266: ...Appendix A 4 Service Support SIPLUS HCS4200 PROFINET PROFIBUS DP 264 Operating Instructions 07 2019 A5E35066204A 006 ...