Connecting
6.6 Connecting the heating elements and three-phase line supply
SIPLUS HCS4200 PROFINET/PROFIBUS DP
90
Operating Instructions, 07/2019, A5E35066204A/006
2-pin connection between phase and neutral conductor (230 V)
For 2-pin switching of the outputs, the loads must be switched via the power semiconductors
from two channels. This has the following advantage: In case of a cut-off of one of the two
main power semiconductors (short-circuit), operation is still possible or the load can be
turned off.
With this type of connection only channels 1 to 4 are used.
Figure 6-6
POM4220 Highend power outputs - 2-pin connection between phase and neutral
conductor
Please note the particularities of this type of connection regarding the following aspects:
●
Configuration parameters (see Configuration parameters for CIM and POM (Page 108))
●
Cyclic data (see Cyclic data exchange (Page 155))
●
Measured values (see Acyclic input data (Page 169))
●
Error messages (see Manufacturer-specific error codes (Page 175))
Содержание SIPLUS HCS Series
Страница 1: ...SIPLUS HCS4200 PROFINET PROFIBUS DP ...
Страница 2: ......
Страница 10: ...Table of contents SIPLUS HCS4200 PROFINET PROFIBUS DP 8 Operating Instructions 07 2019 A5E35066204A 006 ...
Страница 266: ...Appendix A 4 Service Support SIPLUS HCS4200 PROFINET PROFIBUS DP 264 Operating Instructions 07 2019 A5E35066204A 006 ...