SINAMICS V20 Inverter
Operating Instructions, 07/2012, A5E03728167
5
Table of contents
Preface ...................................................................................................................................................... 3
1
Safety instructions ..................................................................................................................................... 7
2
Introduction.............................................................................................................................................. 13
2.1
Components of the inverter system .............................................................................................13
2.2
Inverter rating plate ......................................................................................................................14
3
Mechanical installation............................................................................................................................. 15
3.1
Mounting orientation and clearance.............................................................................................15
3.2
Cabinet panel mounting (frame sizes A ... D) ..............................................................................16
3.3
Push-through mounting (frame sizes B ... D)...............................................................................18
4
Electrical installation ................................................................................................................................ 21
4.1
Typical system connections.........................................................................................................21
4.2
Terminal description.....................................................................................................................23
4.3
EMC-compliant installation ..........................................................................................................27
4.4
EMC-compliant cabinet design ....................................................................................................28
5
Commissioning ........................................................................................................................................ 29
5.1
The built-in Basic Operator Panel (BOP).....................................................................................29
5.1.1
Introduction to the built-in BOP....................................................................................................29
5.1.2
Inverter menu structure................................................................................................................31
5.1.3
Viewing inverter status.................................................................................................................32
5.1.4
Editing parameters.......................................................................................................................32
5.1.5
Screen displays............................................................................................................................34
5.1.6
LED states....................................................................................................................................36
5.2
Checking before power-on...........................................................................................................36
5.3
Setting the 50 / 60 Hz selection menu .........................................................................................37
5.4
Starting the motor for test run ......................................................................................................38
5.5
Quick commissioning ...................................................................................................................38
5.5.1
Quick commissioning through the setup menu............................................................................38
5.5.1.1 Structure of the setup menu.........................................................................................................38
5.5.1.2 Setting motor data........................................................................................................................40
5.5.1.3 Setting connection macros...........................................................................................................41
5.5.1.4 Setting application macros...........................................................................................................52
5.5.1.5 Setting common parameters........................................................................................................55
5.5.2
Quick commissioning through the parameter menu ....................................................................56
5.6
Function commissioning ..............................................................................................................59
5.6.1
Overview of inverter functions......................................................................................................59
5.6.2
Commissioning basic functions....................................................................................................61
5.6.2.1 Selecting the stop mode ..............................................................................................................61
5.6.2.2 Running the inverter in JOG mode ..............................................................................................63
5.6.2.3 Setting the voltage boost .............................................................................................................64
Содержание SINAMICS V20 Series
Страница 4: ...Preface SINAMICS V20 Inverter 4 Operating Instructions 07 2012 A5E03728167 ...
Страница 12: ...Safety instructions SINAMICS V20 Inverter 12 Operating Instructions 07 2012 A5E03728167 ...
Страница 232: ...Parameter list 7 2 Parameter list SINAMICS V20 Inverter 232 Operating Instructions 07 2012 A5E03728167 ...
Страница 274: ...Index SINAMICS V20 Inverter 274 Operating Instructions 07 2012 A5E03728167 ...