
signaled. An adjustable supervision time is started after the closure conditions are fulfilled (parameter
CB
make time
). If the conditions remain valid until expiry of the time, the function gives the release for closure
after expiry of the time.
Direct Close Command
If the Direct close command operation is active, the function instantaneously initiates the release for closure
after the successful start (see chapter
). A combination of direct close command
with other release conditions is not advisable, as these conditions are bypassed by the direct close command.
End of the Process
If the function is started via the device-internal controller , these functions also terminate the synchronization
process upon closure. The process is terminated via the corresponding binary signals in case of external
starting.
If the supervision time (
Max.durat. sync.process
parameter) has expired, the process is also completed
and the indication
Max. time exceeded
is issued. A renewed synchronization is only possible if the stage is
restarted.
Blocking Closure
You can use the input signal
>Block close command
to block the release signal for the closure (signal
Release close cmd.
) as well as the closure itself. The measurement continues to operate during the
blocking. If the blocking is revoked and the release conditions are still fulfilled, the release is given for closure.
Control Functions
6.4 Synchronization Function
376
SIPROTEC 5, High-Voltage Bay Controller, Manual
C53000-G5040-C015-9, Edition 11.2017
Содержание 6MD85
Страница 8: ...8 SIPROTEC 5 High Voltage Bay Controller Manual C53000 G5040 C015 9 Edition 11 2017 ...
Страница 30: ...30 SIPROTEC 5 High Voltage Bay Controller Manual C53000 G5040 C015 9 Edition 11 2017 ...
Страница 46: ...46 SIPROTEC 5 High Voltage Bay Controller Manual C53000 G5040 C015 9 Edition 11 2017 ...
Страница 172: ...172 SIPROTEC 5 High Voltage Bay Controller Manual C53000 G5040 C015 9 Edition 11 2017 ...
Страница 514: ...514 SIPROTEC 5 High Voltage Bay Controller Manual C53000 G5040 C015 9 Edition 11 2017 ...
Страница 1056: ...1056 SIPROTEC 5 High Voltage Bay Controller Manual C53000 G5040 C015 9 Edition 11 2017 ...
Страница 1092: ...1092 SIPROTEC 5 High Voltage Bay Controller Manual C53000 G5040 C015 9 Edition 11 2017 ...
Страница 1204: ...1204 SIPROTEC 5 High Voltage Bay Controller Manual C53000 G5040 C015 9 Edition 11 2017 ...
Страница 1238: ...1238 SIPROTEC 5 High Voltage Bay Controller Manual C53000 G5040 C015 9 Edition 11 2017 ...
Страница 1252: ...1252 SIPROTEC 5 High Voltage Bay Controller Manual C53000 G5040 C015 9 Edition 11 2017 ...
Страница 1256: ...1256 SIPROTEC 5 High Voltage Bay Controller Manual C53000 G5040 C015 9 Edition 11 2017 ...