![shelolab SRI21D Скачать руководство пользователя страница 63](http://html.mh-extra.com/html/shelolab/sri21d/sri21d_installation-and-operation-manual_1255384063.webp)
63 |
P a g e
USER MAINTENANCE
Note:
Does the car actually have gas in the tank? Have you physically verified the computer is
plugged in? Yes, we are going ask some very basic questions. Please bear with us.
Methodical verifications and the elimination of assumptions are often the quickest means of
getting a unit back into operation.
Before Starting
1.
The unit must be connected to a power source that meets the requirements in the Installation chapter
(page 15) and turned on.
2.
A reference temperature device sensor probe must be placed in the chamber.
•
See the probe placement instructions in the
Temperature Calibration procedure
on
page 46.
3.
The unit must have adequate time to come up to temperature and stabilize.
Failure to wait will result
in an inaccurate diagnosis
.
•
Allow 4 hours for the unit to achieve its temperature.
•
Start the “Diagnostic Data Procedure”
when the allotted time has passed
, even if the unit fails to
achieve the set point temperature.
Содержание SRI21D
Страница 1: ...DIURNAL PLANT GROWTH CHAMBER 115 Voltage Installation Operation Manual SRI21D ...
Страница 8: ...8 P a g e INTRODUCTION ...
Страница 12: ...12 P a g e RECEIVING YOUR UNIT ...
Страница 20: ...20 P a g e GRAPHIC SYMBOLS ...