![shelolab SRI21D Скачать руководство пользователя страница 17](http://html.mh-extra.com/html/shelolab/sri21d/sri21d_installation-and-operation-manual_1255384017.webp)
17 |
P a g e
INSTALLATION
A
DJUST
S
HELVES
Note:
The form factor of the shelves may vary slightly by year of production.
The unit ships with its shelves installed in the incubation chamber. Tape, foam, and other packing
dunnage is used to secure the shelves during transit and prevent damage to the chamber interior.
1.
Remove all shipping dunnage from the shelving.
Optional:
Shelf Adjustment
Move the shelves as needed for your application.
Figure 2: Shelf Installed
2. Install the right side
mounting prongs first
3. Install the left side
mounting prongs last
1. Tilt the shelf at rough 60°
when moving up or down
to avoid scarping the
chamber walls.
Содержание SRI21D
Страница 1: ...DIURNAL PLANT GROWTH CHAMBER 115 Voltage Installation Operation Manual SRI21D ...
Страница 8: ...8 P a g e INTRODUCTION ...
Страница 12: ...12 P a g e RECEIVING YOUR UNIT ...
Страница 20: ...20 P a g e GRAPHIC SYMBOLS ...