![shelolab SRI21D Скачать руководство пользователя страница 39](http://html.mh-extra.com/html/shelolab/sri21d/sri21d_installation-and-operation-manual_1255384039.webp)
39 |
P a g e
OPERATION
Note:
The auto day – night cycle will not launch until the start time of the next day phase is reached.
L
AUNCHING THE
D
AY
-
N
IGHT
C
YCLE
Carryout the following steps to set the Day – Night Cycle to launch:
1.
Press and briefly hold the EZ1 button.
•
After a brief pause, a red graph icon will illuminate on the right side of the controller
home page.
•
The controller will wait until the start of the next Day Phase
to adjust the lighting and
temperature of the cultivation chamber.
•
The cycle will run until terminated by an end user.
To terminate
the Cycle, briefly press and hold the EZ1 button. After a short pause, the red graph icon
will turn off. The Cycle has now ended.
A
CCESSORY
C
OMPATIBILITY AND
P
OWER
O
UTLET
The SRI21D is provided with a 115 voltage, 1 amp power outlet inside the chamber. Do not attach
powered equipment that draws more than 1 amp.
Verify that any powered accessory equipment used inside the chamber can safely and effectively
operate within your selected temperature range. Powered equipment types such as stirrers or
shakers, can generate heat sufficient to disrupt the thermal uniformity and stability of the chamber.
Figure 10: Home Page
Cycle operating in the day phase
The 2 indicates that the day
illumination lights are active
Содержание SRI21D
Страница 1: ...DIURNAL PLANT GROWTH CHAMBER 115 Voltage Installation Operation Manual SRI21D ...
Страница 8: ...8 P a g e INTRODUCTION ...
Страница 12: ...12 P a g e RECEIVING YOUR UNIT ...
Страница 20: ...20 P a g e GRAPHIC SYMBOLS ...