![shelolab SRI21D Скачать руководство пользователя страница 21](http://html.mh-extra.com/html/shelolab/sri21d/sri21d_installation-and-operation-manual_1255384021.webp)
21 |
P a g e
CONTROL PANEL OVERVIEW
Power Switch
The power switch controls all power to the chamber and its systems. Power is supplied when the
switch is illuminated and in the ( I ) ON position. ( O ) is the OFF position.
Temperature Controller
The controller arrow buttons are used to adjust the temperature set point, perform calibrations, and
adjusting the parameter settings of the Day – Night Cycle.
The EZ1 button is used to launch and terminate the Day - Night Cycle of alternating illumination and
temperature phases in the cultivation chamber. The EZ2 button does not have a function in the SRI
chamber.
The green Advance button is used to scroll forward through Day – Night Cycle pages and to save
entered time and temperature parameter values.
The
Reset button scrolls the display back to a previous page or menu and also saves currently
selected parameter values. Pressing the Reset button repeatedly returns the display to the
Homepage.
Note:
On some older controllers, the Reset button may be labeled with an infinity
∞
symbol rather
than RESET.
Homepage
Current chamber air
temperature in red
Set point in green
“6” indicates night
mode
Figure 3: Control Panel
Содержание SRI21D
Страница 1: ...DIURNAL PLANT GROWTH CHAMBER 115 Voltage Installation Operation Manual SRI21D ...
Страница 8: ...8 P a g e INTRODUCTION ...
Страница 12: ...12 P a g e RECEIVING YOUR UNIT ...
Страница 20: ...20 P a g e GRAPHIC SYMBOLS ...